Monday, 24 December 2007

Mysore airport, a status report

Truck loads of material was seen arriving every five minutes, material that would be used at the site. The main runway to cater initially for ATR-72 type Aircraft (68 passengers) is being completed. This will be extended in the second phase to accommodate larger Aircraft such as the Airbus A320/Boeing B737 types...More...