
Panel by panel -- including the wooden floor, the doors, the veranda railings -- as also the rafters of the ceiling and the red tiles of the roof, were dismanhttp://www.blogger.com/img/blank.giftled, packed and trucked to the Khet, where it was then reassembled. It took a team of six Asaris (carpenters), their leader a veteran traditional temple builder, more than two months to do the reassembly.......Read more here